Our Upcoming Projects

Know More

Virginia

M Star Hotel

This will be a 67 unit workforce housing complex, located in Covington, VA. Also, fully powered by solar with a
System size of 250 Kw.

MERU Campus of Care for health and wellness

MERU Campus of Care for health and wellness

This is a 76 unit assisted living facility coming up in Covington, VA. This will be a net zero facility, fully powered by solar, and emergency back up power being provided by a battery bank of Li-Ion batteries. We will use the roof space, and the parking lot space for solar.

Magnuson Inn

Magnuson Inn

This is a hotel complex, located in Covington, VA will be powered by a solar system of size of 328 Kw system.

Hershberger Meadows

Hershberger Meadows

This will be a 230 unit Net Zero apartment complex which will be fully powered by geo thermal and Solar System of size 1 MW and 1.5 MW battery system.

Williamson Road

Williamson Road

This is a retail complex, located in Roanoke, VA which will be powered by a solar system of size 167 Kw.

Massachusetts

Temple1

Temple1

This is a temple located in Bellingham, MA. This complex will be powered by geothermal, and solar system along with Battery.
System Size: 1 MW solar system + 1.5 MW Battery System

Temple2

Temple2

This is a Temple located in Groton, MA. This complex will be powered by solar + Battery system and Geothermal system.
System Size: 1 MW solar system + 1.5 MW Battery System

Illinois

Marengo, IL

Marengo, IL

1 MW project, co-located for Community Solar

Des plaines, IL

Des plaines, IL

3 MW project, co-located for Community Solar

© Copyright 2023, AMP Landing Page designed and developed with ❤️ by  NectarSpot Inc. at Naperville, IL